GreenTech & Associates Projects Experience 

GreenTech and associates have an experienced team with award-winning, high-level projects from vision to reality. GreenTech and its associates acted as project management company starting with pre-construction to full completion of several major construction projects in the Southeast region. During its more than 30 years of experience, GreenTech and its associates have led program management, pre-construction management, general contracting, construction management, design / construction, project assistance and IPD initiatives. This wealth of experience means that our team has the qualifications to take your project from beginning to end – on time, within budget and with the highest quality standards.

Morongo Casino Resort

Morongo Casino Resort

Morongo Casino Resort & Spa - $380M

Provided initial master plan (infrastructure and buildings) conceptual/programmatic estimate with minimal documentation including hotel, performance venues, retails, casino, spa, site amenities, parking, etc., Assisted in establishing Owner’s budget


UCF College of Medicine

UCF College of Medicine

UCF College of Medicine - $52M

Directed through DD level estimate, 50% CD check estimate, early site/foundations, coordinated for early GMP for this 175,000 sf university medical project seeking LEED Silver certification.

UCF Performing Arts Complex

UCF Performing Arts Complex

UCF Performing Arts Complex - $22M

Collaborated with team through conceptual/programmatic/schematic estimate for this 18,000 sf performing arts facility. (Phase 1 only)


Wyndham Bonnet Creek Resort

Wyndham Bonnet Creek Resort

Wyndham Bonnet Creek Resort - $128M

Directed design assist from pre-construction through GMP for this 1,407,100 sf resort with 757 units in 7 buildings. (Phase 1 only)


UFC Convocation Center

UFC Convocation Center

UFC Convocation Center - $58M

Directed conceptual estimating, design assist, and pre-construction services through GMP for 260,590 sf of construction and 87,900 sf of renovation of 10,000 seat arena, convocation center, and entertainment venue.


UFC Nicholson Fieldhouse

UFC Nicholson Fieldhouse

UFC Nicholson Fieldhouse - $6.5M

Furnished conceptual estimating, design assist, and pre-construction services through GMP for 80,000 sf clear span indoor football practice facility.


SCC Altamonte Campus

SCC Altamonte Campus

SCC Altamonte Campus Allied Health Building - $22.5M

Provided conceptual estimating, design assist, and pre-construction services through GMP for this 105,000 sf, four-story academic training building.


Beach Villas at Ko Olina

Beach Villas at Ko Olina

Beach Villas at Ko Olina, Hawaii - $185M

Provided conceptual estimating, design assist, and pre-construction and construction management services for this 714,440 sf project including 247 units in 3 building, as well as 12 - and 15- story towers.


Disney Animal Kingdom Lodge

Disney Animal Kingdom Lodge

Disney Vacation Club, Animal Kingdom Lodge - $200M

Directed pre-construction management services through GMP on two concurrent projects: the ew construction of a 750,000 sf building with 340 DVC units, and the renovation of existing DAKL floors 5 & 6 into 108 DVC units. The project included extensive site amenities, animal buildings and animal Savannah coordination.


Peabody Hotel Expansion

Peabody Hotel Expansion

Peabody Orlando Hotel Expansion - $250M

Provided initial conceptual/schematic estimate with minimal documentation for the Peabody’s new tower addition, which includes 1,641 rooms, 210,000 sf of meeting space, a spa, extensive pools/site amenities and a 2,200-space parking garage.

Sheraton Myrtle Beach

Sheraton Myrtle Beach

Sheraton Myrtle Beach Convention Center Hotel - $32M

Directed conceptual estimating, design assist, and pre-construction services through GMP for this 262,460 sf hotel/convention facility with 400 rooms

Oakland Housing Authority

Oakland Housing Authority

933 46th Street – Oakland, California

Is a governmental / public use (general) located in Oakland, CA 94608. This property features 9,999 sq ft lot.

Broadway Street

Broadway Street

1785-1787 Broadway Street - San Francisco, California

Full renovation of Beautiful Victorian with 2nd Unit! Lovely formal living & dining room, elegant staircase & foyer, 1/2 bath. Large eat-in kitchen with Viking range, SubZero, gas fireplace & farmhouse sink. 2nd floor provides master with en suite bath, 2 bedrooms, 2nd bath & laundry closet. French doors leading to large terraces flank the top floor media room, 4th bedroom & bath. Perhaps just as exciting is the 4th view terrace spanning the roof! 4 gas fireplaces. High ceilings, h/w floors & charm. Don’t miss the private rear unit with tiled garden, storage shed, open floor plan, kitchen, 2 bedrooms, 2 baths & in-unit laundry

Mallorca Way

Mallorca Way

112-114 Mallorca Way - San Francisco, California

Outstanding renovation of this grand scale Marina 4.810 sf residence! Comparable to a New York penthouse, the residence offers high end, designer finishes, great scale & a versatile floor plan. Huge great room + secondary family room! Fabulous, updated one bedroom apartment with full kitchen opens directly to the large level lawn and yard

OAKLAND PUBLIC LIBRARY

OAKLAND PUBLIC LIBRARY

Oakland Public Library "Dimond- Rohan Branch"

Renovation of Dimond Branch Library located in the Dimond District of Oakland, California and is one of sixteen neighborhood libraries of the Oakland Public Library

Project Lamb

Project Lamb

Project Lamb - Walnut Creek, California

Full renovation of single house family located in Walnut Creek, Califonia